Industrial Valve Summit
ORGANIZERS
confindustriabergamo@2x
promoberg@2x
  • Home
  • The Event
    • About
    • 2022 Show Report
    • Accademia Carrara – IVS Partner Museum
    • Documents & Studies
  • For Visitors
    • Why Visit
    • Exhibitors List 2022
    • General Information
    • Visa Information
    • Accomodation
    • Discover Bergamo
    • Side Events 2022
    • Exhibition Center Map
  • For Exhibitors
    • Why Exhibit
    • Exhibitors Business Activity
    • Exhibitors area
  • News
  • Conference
    • Think Tank 2022
    • Conference Programme 2022
    • Conference Documents
    • IVS Warm-up
    • Advisory Board 2022
    • Conference Themes 2022
    • Previous Edition
      • Conference Programme 2019
  • Press & Media
    • Media Partner
    • Press release
    • Press review
  • Sponsorship
    • Why sponsor
  • IVS Young
  • Gallery
    • Photo gallery 2022
    • Video gallery 2022
  • Contacts
Industrial Valve Summit

Allsea’s PIONEERING SPIRIT vessel installs Sverdrup drilling platform topsides

inIVS 2019

Allsea’s PIONEERING SPIRIT vessel installs Sverdrup drilling platform topsides

PIONEERING SPIRIT construction vessel completed the heaviest installation lift work for the Equinor’s Johan Sverdrup development in the Norwegian North Sea.
The 147-m (482-ft) tall topsides was transferred from a barge to the PIONEERING SPIRIT at Bømlafjorden, in western Norway. The installation program lasted three hours.
The PIONEERING SPIRIT will return to the field in spring 2019 to install other sections of the platforms (additional topside and living quarters).
Equinor points out that the new lifting technology on the Pioneering Spirit allows entire topsides of up to 48,000 metric tons (52,911 tons) to be lifted in one operation, a new world record.
Equinor expects the drilling platform to be onstream from 4Q 2018, and first oil in late 2019.

  • New plans for Balder field in the North Sea
    Previous PostNew plans for Balder field in the North Sea
  • Next PostNew systems for North Sea Sverdrup development
    New plans for Balder field in the North Sea
Industrial Valve Summit
info@industrialvalvesummit.com

Privacy Policy
Legal notes
Cookie policy

Cookies Settings
Follow Us
Download IVS App
appstore-en-badge
google-play-badge

Powered by NETBANANA

Copy