Industrial Valve Summit
ORGANIZERS

promoberg@2x
  • Home
  • The Event
    • About
    • Documents & Studies
    • Accademia Carrara – IVS Partner Museum
    • IVS Think Tank
  • Fly to Bergamo
    • Bergamo airport (BGY)
    • Air Arabia
    • flydubai
  • For Visitors
    • Why Visit
    • General Information
    • IVS 2024 Exhibitor List
    • Visa Information
    • Accomodation
    • Discover Bergamo
    • Side Events
  • For Exhibitors
    • Why Exhibit
    • Exhibitors Business Activity
    • AI Area
    • Marketing KIT
  • Conferences
    • Call for Papers 2026
    • Scientific Committee 2026
    • Conference Themes 2026
    • Conference Programme 2024
  • Press & Media
    • Media Partner
    • Press release
    • Press review
  • Sponsorship
    • Why sponsor
  • IVS YOUNG
    • IVS Factory Visits
    • IVS Scholarship
    • RadioAut
  • Gallery
    • Photo gallery
    • Video gallery 2024
  • Contacts
Industrial Valve Summit

New Zinia 2 project offshore Angola

Total and its partners launched the new $1.2 billion Zinia 2 project, (150 km (93 mi) offshore Angola.
The combined nine wells are located in water depths of 600-1,200 m (1,968-3,937 ft) and will produce 40,000 b/d, but other tiebacks could follow.
Total shares the project with Equinor (23.33%), Exxon Mobil (20%), and BP (16.67%), while Sonangol is concessionaire. In the meantime the French company will start production this summer from the deepwater Kaombo project in offshore block 32.
The global development is designed to extract 650 MMbbl via two converted FPSOs with a total production capacity of 230,000 b/d.

  • ENI AIMS ON PHOTOVOLTAIC
    Previous PostENI AIMS ON PHOTOVOLTAIC
  • Next PostNew plans for Balder field in the North Sea
    ENI AIMS ON PHOTOVOLTAIC
Industrial Valve Summit

info@industrialvalvesummit.com

Privacy Policy
Legal notes
Cookie policy

Cookies Settings
Follow Us

IVS INDUSTRIAL VALVE SUMMIT
Bergamo Exhibition Center, Italy
Via Lunga 24125 Bergamo

How to get to IVS

Download IVS App
appstore-en-badge
google-play-badge

Powered by NETBANANA

Copy