Industrial Valve Summit
ORGANIZERS

promoberg@2x
  • Home
  • The Event
    • About
    • Opening hours and venue
    • Accademia Carrara – IVS Partner Museum
    • IVS gres art 671 Partnership
    • International Piano Festival of Brescia and Bergamo
    • IVS 2026 Gala dinner
    • IVS 10th birthday!
    • IVS THINK TANK
  • Fly to Bergamo
    • Bergamo airport (BGY)
    • Air Arabia
    • flydubai
  • For Visitors
    • Why Visit
    • IVS 2026 Exhibitor List
    • General Information
    • Visa Information
    • Accomodation
    • Discover Bergamo
    • Side Events
  • For Exhibitors
    • Why Exhibit
    • Exhibitors Business Activity
    • Marketing KIT
  • News
  • Conferences
    • Conference Programme 2026
    • Call for Papers 2026
    • Scientific Committee 2026
    • Conference Themes 2026
    • Special Roundtables 2026
    • Documents & Studies
  • Press & Media
    • Media Partner
    • Press release
    • Press review
  • Sponsorship
    • Why sponsor
  • IVS Young
    • IVS Young
    • IVS Roberto Brevi scholarship
    • IVS Starline scholarship
    • IVS Factory Visits
    • RadioAut
  • Gallery
    • Photo gallery
    • Video gallery
  • Contacts
Industrial Valve Summit

Petronas Malaysia Sepat Offshore FPSO

  1. Home
  2. /
  3. News from IVS 2025
  4. /
  5. Petronas Malaysia Sepat Offshore...
Introduction

YPF Eni Argentina LNG Vaca Muerta Phase 1 FLNG
Apr. 2 – 2026

Since 2010, the national oil company (NOC), Petrolian Nasional Bhd (Petronas), has decided to put efforts to develop marginal fields offshore Malaysia.
Around the Malaysian peninsula, Petronas identified 106 marginal oil fields representing more than 580 million barrels of crude oil that it cannot ignore any longer.
These marginal oil fields are defined as to contain 30 million barrels maximum each.
But with crude oil around $100 per barrel, these marginal fields hold $58 billion worth of oil.

Petronas Malaysia Sepat Offshore FPSO History

In addition to this marginal fields exploration and production, the ongoing Economic Transformation Program is targeting to increase the crude oil recovery rate in Malaysia from the current 26% to 40% on the next 5 years with the help of intensive enhanced oil recovery (EOR) projects.

With the ambition to develop 25% of these marginal fields, Petronas decided to move on the Sepat and Beranta marginal oil fields in April 2011.

Contracted to Petrofac from UK, to provide Petronas with a converted floating, storage and offloading (FSO) vessel, Sepat started its first production of crude oil on first half 2012.

to continue reading click here:
https://2b1stconsulting.com/petronas-malaysia-sepat-offshore-fpso/

  • YPF Eni Argentina LNG Vaca Muerta Phase 1 FLNG
    Previous PostYPF Eni Argentina LNG Vaca Muerta Phase 1 FLNG
Industrial Valve Summit

info@industrialvalvesummit.com

Privacy Policy
Legal notes
Cookie policy
Accessibility statement

Cookies Settings

Follow Us

IVS INDUSTRIAL VALVE SUMMIT

Bergamo Exhibition Center
Via Lunga 24125 Bergamo, Italy

How to get to IVS

Download IVS App
appstore-en-badge
google-play-badge

Powered by NETBANANA

Copy