Industrial Valve Summit
ORGANIZERS

promoberg@2x
  • Home
  • The Event
    • About
    • Opening hours and venue
    • Accademia Carrara – IVS Partner Museum
    • IVS gres art 671 Partnership
    • International Piano Festival of Brescia and Bergamo
    • IVS 2026 Gala dinner
    • IVS 10th birthday!
    • IVS THINK TANK
  • Fly to Bergamo
    • Bergamo airport (BGY)
    • Air Arabia
    • flydubai
  • For Visitors
    • Why Visit
    • IVS 2026 Exhibitor List
    • General Information
    • Visa Information
    • Accomodation
    • Discover Bergamo
    • Side Events
  • For Exhibitors
    • Why Exhibit
    • Exhibitors Business Activity
    • Marketing KIT
  • News
  • Conferences
    • Conference Programme 2026
    • Call for Papers 2026
    • Scientific Committee 2026
    • Conference Themes 2026
    • Special Roundtables 2026
    • Documents & Studies
  • Press & Media
    • Media Partner
    • Press release
    • Press review
  • Sponsorship
    • Why sponsor
  • IVS Young
    • IVS Young
    • IVS Roberto Brevi scholarship
    • IVS Starline scholarship
    • IVS Factory Visits
    • RadioAut
  • Gallery
    • Photo gallery
    • Video gallery
  • Contacts
Industrial Valve Summit

PILOT LNG GALVESTON LNG BUNKER PORT (GLBP) FLNG

  1. Home
  2. /
  3. News from IVS 2025
  4. /
  5. PILOT LNG GALVESTON LNG...

Pilot LNG is a newly established independent company registered in Houston, Texas, purposely created for this Galveston LNG Bunker Port project on the Pelican Island near Galveston on the US Gulf Coast of Texas, USA.

PILOT LNG GALVESTON LNG BUNKER PORT (GLBP) FLNG History
The purpose of the project is to use liquefied natural gas (LNG) as a marine fuel to reduce emissions.
On January 2020, a new regulation has become effective to reduce sulfur emissions (SOx) and other emissions (NOx) from the shipping industry.
In addition in USA, the LNG is offering a more competitive fuel than conventional marine heavy fuel.
Pilot LNG completed the pre-front end engineering and design (pre-FEED) and is proceeding with the permitting for the site location on the Pelican Island.
This small-scale FLNG project should include a:

Floating LNG vessel to upload the ships refilling for LNG fuel
Onshore infrastructure to receive the natural gas from the local gas transportation system
Gas connector pipeline to supply the onshore installation.
The FLNG should be equipped with one LNG Train of 0.65 million tonnes per year (t/y)
The onshore infrastructures should host 3 tanks of 18,000 cubic meter.

to continue reading click here:

https://2b1stconsulting.com/pilot-lng-galveston-lng-bunker-port-glbp-flng/

  • Webinar - Oil & Gas Projects Evolution
    Previous PostWebinar - Oil & Gas Projects Evolution
  • Next PostWEBINAR: Recap 2025, Forecast 2026
    Webinar - Oil & Gas Projects Evolution
Industrial Valve Summit

info@industrialvalvesummit.com

Privacy Policy
Legal notes
Cookie policy
Accessibility statement

Cookies Settings

Follow Us

IVS INDUSTRIAL VALVE SUMMIT

Bergamo Exhibition Center
Via Lunga 24125 Bergamo, Italy

How to get to IVS

Download IVS App
appstore-en-badge
google-play-badge

Powered by NETBANANA

Copy