Eni has completed the gas pipeline in Algeria with Sonatrach
Eni and Sonatrach have completed the 185 km gas pipeline construction in the onshore Berkine basin.The pipeline connects the Bir Rebaa Nord and Menzel Ledjmet Est fields. When operating at full capacity, the gas pipeline will bring the production to a total of 7 million cubic meters of gas per day and 10,000 barrels of associated liquids. This, together with the oil development will allow a production of 65,000 barrels of oil per day. Eni has been in operation in Algeria since 1981, with an equity production of around 90,000 boepd.